Frame Assembly

Assembling the Frame is a process of laying out and  the pieces and connecting them together

Bottom Rail Assembly

Above Ground Pools Installation  Step 2 Frame Assembly

Notice in this picture underneath every rail connection where the upright assemble there is a patio block. These blocks should be counter sunk (which these guys haven't done yet). They are a must for improved stability of your pool and are available at your home supply store for under two dollars usually. The surveying these folks are doing is good, but don't worry  if you don't have the equipment.  A good level will give you the same results.

ap

Oval Pool Buttresses

Above Ground Pools Installation  Step 2 Frame Assembly

Oval pools require an extra preparation with the side braces.  This picture shows the buttress frame of an oval pool being assembled, as always with a level. Every extra step of precaution you take in this step of the process will pay steep dividends in the end product.

ap

Under Pool Bracing  (Oval Pools)

bracing

While this picture shows the pool further along in assembly, it does show the under pool strapping that is installed under Oval Braced Pools

Uprights

Install the side braces and you are ready to go onto the next step